WLC was hired to provide a Sanitary Sewer Master Plan in order to evaluate and document the system and its condition. The Town was plagued by sewer main blockages, backups, poor services, and had little information on the condition of their existing system. WLC performed a detailed study to determine the condition of the existing sewer mains, develop a plan and recommendation schedule for rehabilitation work, and provide a schedule and cost estimate to replace deficient components. WLC also investigated potential funding sources.