Evansville Clear Well Tank Rehabilitation

Type of Project

Water Well Tank Rehabilitation

Location

Primary Service

Design Engineering

Client

Town of Evansville, WY.

Client Type

Government

Completed Year

2018

WLC was hired by the Town of Evansville, WY for the Clear Well Tank Rehabilitation project. The project required recoating the interior of two 250,000 gallon welded-steel storage tanks located at the Evansville Water Treatment Plant. The new coating of the storage tanks required prep work consisting of removing the old interior paint and spot filling any corrosion spots. In addition to the recoating, WLC also installed new roof vents as well as modifications to the overflow piping at each tank in order to provide screened air gaps. These modifications were preformed to correct deficiencies noted in an EPA Sanitary Survey. WLC’s primary services for this project included design engineering, contract administration, water tank rehabilitation, and land surveying. This project was completed on time and within budget.

What our clients are saying

“WLC has always provided us with top-notch professional services. The employees provide esponsive, knowledgeable, and friendly service.”
—Joe Dill, Former Mayor