Anadarko Sewer Rehabilitation

Type of Project

Location

Midwest, Wyoming

Primary Service

Civil Engineering

Client

Anadarko

Client Type

Energy

Completed Year

2014

WLC provided an engineering analysis of the existing failing wastewater lagoon system for the Anadarko facility adjacent to the Gas Plant Camp in Midwest, Wyoming. We also analyzed the existing sewer force main and lift station for capacity that serves the Gas Plant Camp area. The lift station for the Anadarko facility had to be sized to meet today’s flows as wells as those expected with the growth in the next 20 years. This lift station would need to be able to discharge into the existing force main during both force main flowing and non-flowing situations and not dead-head either the Anadarko lift station or Gas Plant Camp lift station. WLC determined that the downstream connection to the Town of Midwest and force main could handle the additional flows that would be coming from the existing Anadarko facility and its expected expansion over the next 20 years. WLC designed a lift station to collect wastewater flows from the Anadarko facility and pump into the force main between the Gas Plant Camp lift station and the Town of Midwest collection system. Following the completion of design, WLC oversaw the construction of the lift station and connection into the existing force main.

What our clients are saying

“WLC has always provided us with top-notch professional services. The employees provide esponsive, knowledgeable, and friendly service.”
—Joe Dill, Former Mayor