WLC Engineering and Surveying was hired by the City of Casper to design and provide construction services for road and pedestrian surfacing , storm water, and watermain improvements. Prior to design and construction, WLC provided geotechnical information by obtaining asphalt cores for the length of 1st Street to determine the current section and develop a new design that fit the existing section. Specifically, design improvements included resurfacing concrete sidewalk and curb and gutter spot repairs 1st Street from Yellowstone to Beverly; retrofitting many of the sidewalks to include ADA ramps; limiting and eliminating pedestrian crossings; replacing watermain; and PMP overlay. Additionally, WLC provided construction contract administration. WLC phased the project to enable the contractor to complete large chunks of work along 1st Street. Willard Elementary School is near the east end of the project and phasing the project enabled construction adjacent to the school to be completed during the summer when school was not in session. This also allowed WLC to minimize road closures along 1st Street and only minimally affect traffic.
1st Street Improvements
Type of Project
Location
Casper, Wyoming
Primary Service
Civil Engineering, Land Surveying, Construction Contract Administration
Client
City of Casper
Client Type
Government
Completed Year
2015
See More Recent Projects
Click on a project to read more and see our work in action.
What our clients are saying
“WLC has always provided us with top-notch professional services. The employees provide esponsive, knowledgeable, and friendly service.”