Due to the lack of parking at the Casper Natrona County International Airport (CNCIA), the airport manager hired WLC to provide parking feasibility studies, to analyze the space for additional parking at six pre-identified potential parking areas. The CNCIA was hoping to secure 70-80 additional parking spaces through the supplementary parking area. WLC provided the preliminary design and layout for each of the six areas and submitted the plans to the airport for review.
After selecting the final layout for construction, CNCIA hired WLC to provide construction management including bidding, surveying, observation, and project closeout.