Bar Nunn Industrial Center

In 2009, WLC was hired by a local developer and the Town of Bar Nunn to administer a $3 million Wyoming Business Council (WBC) Business Committed Grant to develop the 170-acre Bar Nunn Industrial Center. Development required the installation of over two miles of asphalt and concrete paved roadways (38,500 SY), 5,870 lineal feet of sewer main, a sanitary sewer lift station, numerous connections to an existing water main for service and fire protection, and over 500 feet of storm sewer pipe.

WLC prepared the plat for the Center consisting of five lots ranging from 25 to 49 acres. WLC performed the civil design and survey services for the project which included the water, sanitary sewer, storm sewer, and roadway designs. WLC developed the overall drainage plan and design consisting of several large detention facilities to mitigate runoff from the site and surrounding area. Upon design completion, WLC performed the contract and construction administration services. The project was bid as two projects; therefore, WLC was responsible for administering two separate contracts for the developer. This project involved coordination with several entities including the Town of Bar Nunn, WDEQ, Wardwell Water and Sewer District, WYDOT, and the Central Wyoming Regional Water Board. In addition, coordination was required with a firm designing an adjacent residential development that was utilizing much of the infrastructure constructed for the Industrial Center.

WLC also provided grant administration services for the Town of Bar Nunn including all necessary record keeping required by the WBC, preparation of drawdown requests for submittal to the WBC, and preparation and submittal of the quarterly reports. The project was completed in 2011.

BACK

 
 
Copyright © 2008. WLC. All Rights Reserved.
Site Designed by Ball Advertising Group, Inc.